After The Build-Out

Post-Construction Office Cleaning in NYC

Contractors build. They do not clean, whatever the contract says. After a build-out or renovation, drywall dust is in the vents, on every ledge, inside every cabinet, and it keeps settling for weeks. We clear it in phases so your team moves into a finished office, not a job site.

  • Phased rough and final cleans
  • Fine dust cleared, not spread
  • Fully insured, COI on request
A Breezy cleaner vacuuming fine dust in a freshly built-out Manhattan office
5.0 on Google, 21 reviews
Cleaning since 2012
The Overview

Construction dust does not leave on its own

Drywall, concrete, and sawdust settle into everything: HVAC vents, light fixtures, window tracks, the tops of door frames, the inside of the new cabinets. A regular cleaning crew pushes it around. A post-construction clean uses HEPA vacuums, tack cloths, and a phased approach that gets it out for good.

We work with your GC's schedule, do a rough clean after the trades finish, and a final detail clean once the punch list is closed, so the office is ready for furniture and people.

A newly finished, spotless NYC office with skyline windows
From punch list to first day, without the dust.
What's Included

What post-construction cleaning covers

Two phases. The rough clean removes debris and the bulk of the dust. The final clean details every surface for handover.

Fine dust removal

HEPA vacuuming and tack-cloth wiping of every surface, high and low, in both phases.

Vents, fixtures & ledges

HVAC grilles, lights, door frames, and the tops of everything, where dust hides longest.

Debris & residue

Adhesive, paint overspray, stickers, and labels removed from glass, fixtures, and floors.

Floors, sealed and detailed

New wood, tile, or polished concrete cleaned to the manufacturer's spec, then protected.

Glass & windows

Interior glass, tracks, and sills detailed, with construction film and labels removed.

Cabinets, closets & restrooms

Inside and out, then disinfected, so the office is ready for people, not just photos.

Breezy cleaners detailing new glass partitions and baseboards after construction

The final clean is the one people remember

The rough clean is muscle. The final clean is where a job site becomes an office: fingerprints off the new glass, dust out of the new vents, every handle disinfected. It is scheduled after the last trade leaves, and it is the clean your team walks into.

Pair it with a move-in clean if furniture is landing the same week. See all nine services ›

Why It Matters

Why you need a specialist after a build-out

01

Dust keeps settling

Fine construction dust falls out of the air for weeks. Cleaning once is not enough. Phasing is.

02

New finishes are fragile

Fresh wood, stone, and paint are easy to damage with the wrong product. We match the method to the material.

03

HVAC and air quality

Dust in the vents circulates for months. Clearing it is a health issue, not a cosmetic one.

04

The handover photo

Your architect, your landlord, and your team all want the same thing: the finished office, actually finished.

From job site to office, in two clean phases.

2012Cleaning NYC offices since
5.0On Google, 21 reviews
100%W-2 crews, never 1099
FastCOI to your building, on request
The Breezy crew, a steady and familiar team in black polos with the Breezy logo
The Breezy Difference

A crew that has cleaned up after a lot of contractors

Post-construction cleaning is its own skill. Breezy crews are trained on HEPA equipment, residue removal, and new-finish care, and they coordinate with GCs and building management every week. The result is a handover you do not have to redo.

  • W-2 crews trained on post-construction work
  • HEPA vacuums and tack cloths, not brooms that spread dust
  • Product matched to new wood, stone, glass, and paint
  • Fully insured, with a COI to your building and GC on request
  • Rolls into a move-in clean and nightly service with the same crew
Get a site walk
What It Costs

Post-construction cleaning pricing in NYC

Quoted in crew hours from a site walk near the end of the build. Post-construction work runs heavier than a standard deep clean because of the dust load and the two-phase approach.

Small build-out Under 5,000 sq ft, about 16 to 40 crew hrs $470–$1,550 both phases
Most offices Mid-size build-out 5,000–15,000 sq ft, about 32 to 80 crew hrs $950–$3,100 both phases
Large build-out 15,000+ sq ft, multi-day From $2,400 both phases

Debris hauling and dumpster fees are passed through at cost. These are starting ranges, not quotes. Get an instant estimate or book a free walk-through for an exact, hours-based quote.

Your First Week

What onboarding looks like

From the walk-through to the first check-in, here is how a new account starts. Most offices go from first call to first visit in about a week.

  1. Day 1

    Walk-through and quote

    We walk your space with you, listen to what matters, and build the checklist. You get an hours-based quote, usually within a business day.

  2. Days 2 to 4

    Building paperwork

    COI to your building or landlord, vendor onboarding, badging, keys or access codes, and the freight and after-hours windows your building requires.

  3. First visit

    The crew lead walks it with you

    Your crew lead is on site for the first visit, working from the checklist you approved. Same faces from then on.

  4. End of week one

    Check-in and adjustments

    A quick call or walk to confirm the scope is right. Anything that needs changing is changed on the next visit.

Questions

Post-Construction FAQ

When should the post-construction clean happen?

Rough clean after the trades finish and before flooring protection comes up. Final clean after the punch list is closed and before furniture arrives. We coordinate both with your GC.

Does the contractor's broom clean count?

No. A broom clean removes debris. It leaves fine dust on every surface and in every vent, and it usually spreads more than it removes.

Can you work while the trades are still on site?

For the rough clean, yes, in coordination with the GC. The final clean needs the space to ourselves.

What about the dust that keeps appearing for weeks?

That is why we phase it, and why many clients add a follow-up detail two weeks after move-in. We will tell you if your space needs it.

Are you insured, and can you send a COI?

Yes. We carry full general liability and workers' comp, and we send a Certificate of Insurance to your building or office manager on request. Ask and it goes out fast, usually within a business day or two.

Are your cleaners employees or contractors?

Employees. Every Breezy cleaner is a W-2 hire we train, insure, and keep. We are one of the only W-2 office cleaning companies in New York, and it is the reason a familiar crew shows up instead of a rotating cast of strangers.

The last real office cleaning company in New York

Let's make your office the cleanest address on the block.

Fifteen minutes, no obligation. A steady, familiar crew that learns your office, starting as soon as next week.

We reply the same business day. No spam, no runaround. Or call (347) 916-3457 and a real person answers, 9 to 5:30.

☎ Call Book a Walk-Through